Rope access during a turnaround: how to limit downtime
During a turnaround, every day counts. As long as a plant is shut down for maintenance or inspection, your production is not running. The shorter the downtime, the lower the costs. This is precisely where rope access makes a difference. In this article, you will read why traditional scaffolding often causes delays and how rope access can significantly shorten a shutdown's lead time.
What is a turnaround and why does every day of downtime count?
A turnaround, also called a shutdown or stoppage, is a planned period in which a facility is temporarily taken out of operation for maintenance, inspection, and repair. Think of a refinery, an incinerator, or a process plant. During this period, production cannot occur, while fixed costs continue to accrue. Therefore, every day the facility is back online sooner is direct profit. Speed and reliability of execution are just as important during a turnaround as the quality of the work itself.
The problem with traditional scaffolding during a shutdown
Scaffolding is a familiar solution, but during a turnaround, it often works against you.
Setup and dismantling time
A scaffold must be delivered, erected, and then dismantled and removed. In an installation with multiple levels and tight spaces, this sometimes happens repeatedly. This assembly and dismantling takes days that are not spent on actual maintenance, but do count towards the total downtime.
Limited workspace in tight installations
A boiler or installation is often divided into compartments with confined spaces. Scaffolding takes up a lot of space, leaving less room to work and causing tasks to interfere with each other, which further delays the schedule.
How rope access shortens turnaround time
Rope access addresses the time lost with scaffolding precisely.
Ready to deploy, no ramp-up time
Our technicians reach the worksite using rope and climbing techniques and are immediately ready for use. No extensive construction is required that needs to be built up and later dismantled. This allows maintenance to begin almost immediately and also leaves you with more workspace.
Multidisciplinary teams: inspection and execution in one
Sky People works with experienced technicians who are often versatile in addition to their specialization. From these technicians, we form multidisciplinary teams that align with the planned work. Inspection, repair, preservation, or welding can thus be combined within a single team, without you having to schedule multiple parties. This saves coordination and time.
Calculation example: two weeks less downtime
A practical example. Suppose the boiler of an incinerator needs to be inspected. Such a boiler is often divided into tight compartments. If a scaffold is traditionally used, it has to be erected and dismantled multiple times. Including the inspection, this quickly results in a turnaround time of three weeks.
The inspection itself, using rope access, proceeds exactly the same as from scaffolding. However, by eliminating the setup and dismantling, the downtime of the installation is reduced by approximately two weeks. For the company, that's pure profit. The strength lies in combining the rope technique with the discipline to be performed, so that we arrive at the most efficient solution.
What installations is this suitable for?
Rope access is deployable in virtually any complex or hard-to-reach environment. We have extensive experience with maintenance and inspection in hard-to-reach places within the Industry and petrochemicals, from offshore, the civil sector, and wind energy, both in the Netherlands and Europe. From boilers, tanks, and silos to installations, steel structures, and pipe bridges: where scaffolding is difficult or time-consuming, rope access often offers a faster route.